The 6,084 m² BYD electric substation, to be constructed in Szeged starting in 2025, is being built under a consortium agreement in which MVM Expert is participating in design and technical supervision activities in addition to its electrical engineering tasks; The facility, featuring a unique monolithic reinforced concrete structure, is complemented by a wooden roof structure and a steel structure designed to house the electrical equipment, making the project a key factor in the successful launch of the BYD factory and in ensuring its stable power supply.
BYD Substation
- Function Electric substation
- Location Szeged
- Duration 2025-2026
- Area 6 084 sq m
- Type of work Consortium Agreement, MVM Expert Electrical Section