The 240,000 m² CATL battery factory, which will be built in Debrecen starting in 2023, is being constructed as a turnkey project. As a complex industrial facility comprising multiple sections, it includes structural engineering work, roofing, the installation of industrial flooring, and the installation of state-of-the-art fire alarm systems, thereby ensuring the facility’s high level of functionality and safe operation.
- Function Battery factory
- Location Debrecen
- Duration 2023-2026
- Area 240 000 sq m
- Type of work General contractor