In connection with the CERES Bakery Toast 3.0 facility, West Hungária Bau Ltd. participated in the implementation of preparatory works aimed at ensuring the smooth and efficient launch of the subsequent construction phases. The scope of work included site preparation, the execution of necessary demolition and earthworks, as well as the development of the basic infrastructure required for construction. This phase of the project provided the essential technical and logistical foundation for the realization of the facility, supporting the progress of the development in line with the planned schedule.”
Preparatory works related to the CERES Bakery Toast 3.0 facility
- Function Excavation works
- Location Tata
- Duration 2026
- Type of work Excavation works