As part of the development of Győr’s public parking infrastructure, WHB carried out the complete general construction of the PAMOK parking lot, the temporary parking lot, and the associated indoor parking facilities between 2019 and 2020.
The goal of the project was to create a high-capacity, state-of-the-art parking system that supports traffic calming and urban mobility.
Key elements of the project:
construction of a parking deck with a heavy-duty reinforced concrete structure,
development of temporary surface parking lots,
arrangement of internal traffic and parking areas,
installation of drainage, utility, and lighting infrastructure,
integration of traffic control and safety elements into the Győr urban system.