EVE Energy Battery Factory

The EVE Energy battery factory industrial park, with a floor area of 235,000 m², to be built in Debrecen between 2023 and 2025, is being implemented as a general contractor project. This involves comprehensive master planning, encompassing architectural, mechanical, electrical, structural, and process engineering, the use of the BIM system, and ongoing communication with regulatory authorities, thereby ensuring the coordinated and high-quality execution of the project.

  • Function Industrial park
  • Location Debrecen
  • Duration 2023-2025
  • Area 235 000 sq m
  • Type of work General contractor