Fiwi Game Processing Plant

The 2,000 m² Fiwi Game Processing Plant was built in Tata between 2012 and 2013 as a turnkey project. The work included the construction of the entire plant, the design of the structural elements, and the interior work. The completed facility provides a state-of-the-art environment for efficient and safe game processing.

  • Function Industrial facility
  • Location Tata
  • Duration 2012-2013
  • Area 2 000 sq m
  • Type of work General contractor