WHB Holding’s production facility in Győr was built in 2009, with WHB serving as the general contractor for the entire project.
The goal of the project was to create a state-of-the-art, spacious industrial facility to meet the production, warehousing, and logistics needs of the WHB Group.
IBC WHB Holding
- Function Industrial facility
- Location Győr
- Duration 2009
- Area 7 000 sq m
- Type of work General contractor