Kemenesaljai United Hospital

TIOP 2.2.6.
The aim of the project was to restructure the hospital’s outpatient care system by closing the satellite facility and integrating care functions into a single central building.
The project resulted in the creation of a modern, patient-centered infrastructure that ensures more efficient operations and better care conditions.

  • Function Health Care Facility
  • Location Celldömölk
  • Duration 2014-2015
  • Area 3 500 sq m
  • Type of work General contractor