TIOP 2.2.6.
The aim of the project was to restructure the hospital’s outpatient care system by closing the satellite facility and integrating care functions into a single central building.
The project resulted in the creation of a modern, patient-centered infrastructure that ensures more efficient operations and better care conditions.
Kemenesaljai United Hospital
- Function Health Care Facility
- Location Celldömölk
- Duration 2014-2015
- Area 3 500 sq m
- Type of work General contractor