Markhot Ferenc Hospital

TIOP-2.2.4/09/1-2010-0027
We carried out a complex construction project involving several hospital buildings, which included demolition work, the construction of new structures, and the expansion and renovation of existing building sections. During the project, comprehensive structural, specialized trade, mechanical, and electrical renovation and expansion work was performed.

  • Function Health Care Facility
  • Location Eger
  • Duration 2014-2015
  • Area 8 000 sq m
  • Type of work General contractor