At Nemak’s Győr site, we carried out the development of industrial and office infrastructure in several phases, which involved general construction and specialized trade work carried out continuously between 2011 and 2016.
As part of the project:

G1 office expansion
G2B construction of a sluice gate and roller storage facility
STIKO 6 development works
G2CA foundry general construction and specialized works

The investments were carried out in multiple phases and on various scales, covering areas ranging from 5,000 to 15,000 m², while maintaining the uninterrupted operation of industrial production.
Following the phases in 2011, 2013, 2014, 2015, and 2016, WHB has also continuously performed smaller-scale maintenance and expansion tasks at the site.

  • Function Industrial facility
  • Location Győr
  • Duration Several phases
  • Area 5 000-15 000 sq m
  • Type of work General contractor